Double-row ball slewing ring
Double-row ball slewing ring for wind power is built to meet the extreme operation conditions of wind power generation, such as long-term outdoor working, variable wind load impact, and maintenance-free operation requirements. It is the core component for wind turbine manufacturers, wind farm projects and professional power generation maintenance sevicer.
Features & performance advantages
Dual-row support offers superior stability and reliable working performance.
The slewing ring is equipped with special composite sealing structure, which effectively blocks dust, sand and moisture, entirely suitable for harsh outdoor enviroments. The plastic-coated cage provides good corrosion resistance while reducing working noise and vibration, ensuring long-term stable operation of the equipment.
Specification
| Material |
50Mn/42CrMo/other steel |
Lubrication |
grease |
| Diameter range |
600mm-6000mm |
Package |
plywood pallet/case |
| Gear type |
external gear/internal gear/no gear |
Shipping way |
sea/air/railway |
| Hardness |
HRC55-62 |
Port |
Shanghai/Guangzhou/named port |
| Precision grade |
standard/high precision |
Product orginion |
China |
Our equipment


Why Choose Us
High load capacity, wear resistance & long service life
Strict dimensional tolerance, smooth rotation
Customization drawings / OEM / ODM available
Direct factory price, stable delivery
Complete inspection & test report before shipment
Suitable for heavy-duty engineering & harsh working environment
After Sales Service
Tailored product according to your drawings or samples
Professional technical support anytime
Strict quality inspection & full set of shipping documents
Fast delivery & safe packaging (plywood pallet/case)
One-year quality warranty
FAQ
1. What is the warranty period for this slewing bearing?
We offer a 12-month standard warranty from the day leaving our factory, with extened warranty options available according to clients' demand.
2. What is the lead time for orders?
Custom orders usually take 35-45 working days, while standard orders take 30-35 working days, even less time.